top of page
California Title 24 • QII Field Verification
NEED A QII INSPECTION? CALL OUR TEAM TODAY
Send us a message about your project and we will get back to you as soon as possible.

You can also call or text us.

Visit our website for more services and information about what we do.

ERJ Inspections • Energy Compliance Division
QII Inspections
Done at the Right Stage.

Quality Insulation Installation (QII) field verification for California residential construction. Coordinate air-sealing and insulation checks before walls are closed.

Framing-stage verification

Insulation installation checks

Title 24 support

Schedule before drywall

Need QII verification?

Plan for the two key inspection stages to avoid covering work before it can be verified.

01

Air barrier and infiltration sealing at framing stage

02

Insulation installation before concealment

03

Applicable compliance verification documentation

For Builders & General Contractors

Coordinate QII with your construction schedule.

For Insulation Contractors

Know what must be accessible for inspection.

For Homeowners & ADU Projects

Understand when QII is specified for your job.

WHAT WE INSPECT
Quality insulation starts before drywall.

QII is about more than insulation thickness. Verification examines continuity of the air barrier and whether insulation is installed to perform as intended, based on the applicable plans and energy compliance documents.

01

Air-Sealing / Framing Stage

Observe accessible building-envelope penetrations, gaps, transitions, and air-barrier continuity before insulation conceals the work.

02

Insulation Installation

Check accessible insulation for coverage and proper installation, including gaps, voids, compression, and contact with the air barrier.

03

Title 24 QII Verification

Coordinate verification against project-specific requirements and relevant 2025 Energy Code QII verification documents when applicable.

CONTRACTOR SCHEDULING GUIDE
Two stages.
One coordinated plan.

QII typically requires access at multiple construction stages. Contact us early so your team knows what work should remain visible.

1

Before insulation is installed

Schedule the framing-stage inspection when air-sealing details and the continuous air barrier can still be observed.

2

After insulation, before drywall

Schedule insulation verification while the relevant insulation remains exposed and accessible.

3

Complete required documentation

Coordinate applicable QII verification records with the project’s compliance documentation and registry requirements.

Important: Do not cover work before required verification. Exact inspection scope and code applicability depend on approved energy documents and project conditions.

WHO WE SERVE

Built for busy construction schedules.

ERJ helps construction teams plan QII visits at the stages that matter.

  • Single-family homes and custom residences

​

  • New construction and qualifying additions

​

  • Accessory dwelling units (ADUs), when QII applies

​

  • Applicable multifamily projects

​

  • Builders, insulation contractors, and homeowners

LOCAL SERVICE
QII Inspections in Southern California

Contact ERJ to confirm availability and scheduling for your project location.

FREQUENTLY ASKED QUESTIONS
Questions about QII?
Get your inspection on the calendar
Ready to Schedule a QII Inspection?

Call ERJ Inspections with your project city, address, and current construction stage.

© 2026 ERJ Inspections Inc. · QII Quality Insulation Installation

  • Facebook
  • Instagram
bottom of page